v1.6-v1.7 Critical Path CSS Manager V 1.1.0

elise-alba

Member
XNullUser
Joined
Dec 11, 2021
Messages
135
Reaction score
1
Points
18
NullCash
0
Thank you very much! It is very good module!
Post automatically merged:

only for PS 1.7.1 and higher
$this->ps_versions_compliancy = array('min' => '1.7.1', 'max' => _PS_VERSION_);
 
Last edited:

CoolT Toy

Member
XNullUser
Joined
Mar 24, 2020
Messages
185
Reaction score
11
Points
18
NullCash
2
Thanks, bro / Wright now i need some like this.
I'm recommend too using Chrome ext "Used CSS" to separate critical css rules.
 

volverine

Well-known member
Diamond
Elite
Joined
Sep 7, 2019
Messages
699
Reaction score
305
Points
63
NullCash
42
DEMO:

Features
Critical Path (above-the-fold) CSS manager.
Defers render-blocking CSS if Critical Path management is activated.
Options to activate or disable for home page, product pages and category pages separately.
Get your above-the-fold CSS from the reliable internal scanner, paste it into the manager, save and you are done.

Remove unused CSS.
As a bonus you receive the option to use clean css from unused CSS rules.
Here also you can choose to do home-, category- or product pages separately.
If on a page the critical path CSS is used, you can choose an option to replace the regualr CSS by cleaned CSS (Uncss). This saves up to 80% in file size, Especially in Bootstrap-based themes.
Please note: This option however should be used with care. On heavily styled sites this option is considered a high risk to break the lay-out.
Recommendation
For Prestashop 1.6 sites this only works when Javascript is moved to the bottom.
What's New in Version 1.1.0(05/06/2021)
  • Added scanners
  • Revamped defer mechanism to work with http/2 servers

seems useful, thanks a lot for this
 

lextor

Member
XNullUser
Joined
Oct 30, 2020
Messages
227
Reaction score
0
Points
16
NullCash
988
Your gift really made me smile. I'll think of you every time I use your gift.
 

lucamar

New member
XNullUser
Joined
Oct 27, 2023
Messages
28
Reaction score
0
Points
1
Location
Roma
NullCash
2
Let's see if with this module I can improve the LCP metric on the google speed page. thanks!
 

Vladimir12

Member
XNullUser
Joined
Dec 31, 2020
Messages
191
Reaction score
0
Points
16
NullCash
5
thanks for sharing I'm gonna give it a try on my demo website
 

MisterSpoty

Active member
Elite
XNullUser
Joined
Jul 14, 2021
Messages
174
Reaction score
220
Points
43
NullCash
300
thanks for this module---------------- ------------------ ------------- --------
 

user_name

Well-known member
XNullUser
Joined
May 5, 2020
Messages
124
Reaction score
607
Points
93
NullCash
46
Thank you very much for sharing - it's appreciated! :)
 

farzan

Member
XNullUser
Joined
Sep 21, 2021
Messages
97
Reaction score
0
Points
6
NullCash
2
thank you very much for sharing this great module.
 

7nachik

Member
XNullUser
Joined
May 14, 2022
Messages
217
Reaction score
0
Points
16
NullCash
12
thanks for sharing this module, i will use on some project
 
Top